Overview
When the master production and second-level scheduling order were issued, from the first production process started till the last process completed, it may cost several days or even weeks; standing in the position of manager, to learn about the information of production schedule of scheduling order, the relevant plant material conditions, workers production performance, and the productivity of each production line is particularly important; thus provides the basic information of reducing production costs and improve production efficiency.
Intron ERP site management mainly tracks the status of the producing product of scheduling order and master production, manages the materials of the production site, records production information and production of man-hours information, site management is closely linked with outsourcing system, master production system, BOR system and cost system.
※Work unit automatically scheduled
Complete all time to product production process in accordance with master production produce time, all work units in the factory can automatically schedule according to production process capacity, and automatically dispatch and generate second-level scheduling orders of all work units.
※Cross-master production process merge produce
Second-level scheduling order adds work guide which can aggregate products with different master production and same production process by work units and combine production.
※Second-level scheduling order
Factory work units execute according to second-level scheduling orders which arrange equipment and manpower for production and implement the scheduling order.
※Completed returns
After actual production is completed, each work unit daily returns the completion of master production and actual production hours.
※Employee performance
Employees can set a daily productivity performance by production process in accordance with points X the number of employee produces.
The employee performance can be aggregated and then transferred to salary system to provide pay-for statistics.
※Grade point production costs
Each product actual use of equipment / labor hours may be aggregated by completed returns and transferred to the cost system to meet the staff / machinery standard hourly cost, and calculate production costs of master production by batches.
TOP↑ |